  • COB 9.2.3

    (1) An ATS OperatorG may only make material changes to its existing arrangements to meet the requirements in this chapter in accordance with the requirements in this RuleG .

    (2) The reference to "Existing ArrangementsG " in (1) is a reference to both the arrangements which were in place at the time of the initial grant of the LicenceG and any changes made to such arrangements in accordance with the requirements in this RuleG .

    (3) For the purposes of obtaining the DFSAG approval, an ATS OperatorG must provide to the DFSAG , at least 30 days before the proposed change is intended to come into effect, a notice setting out:

    (a) the proposed change;
    (b) the reasons for the proposed change; and
    (c) what impact the proposed change would have on its members and its ability to operate the facility.

    (4) The DFSAG must, upon receipt of a notice referred to in (1), approve or disapprove the proposed change as soon as practicable and in any event within 30 days of the receipt of the notice, unless that period has been extended by notification to the applicant.

    (5) The DFSAG may, in circumstances where a material change to Current ArrangementsG is shown on reasonable grounds to be urgently needed, accept an application for approval of such a change on shorter notice than 30 days.

    (6) The procedures in Schedule 3 to the Regulatory Law apply to a decision of the DFSAG to reject a proposed change under this Rule.

    (7) Where the DFSAG decides to reject a proposed change, the ATS OperatorG may refer the matter to the FMTG for review.

    [Added] DFSA RM123/2013 (Made 13th June 2013) [VER22/07-13]
    [Amended] DFSA RM175/2016 (Made 10th February 2016). [VER26/04-16]

    • COB 9.2.3 Guidance

      1. The period of 30 days runs from the time the DFSAG has received all the relevant information to assess the application.

      2. An ATS OperatorG should consider submitting its application for the DFSAG approval well in advance of the date on which a proposed amendment is intended to come into effect, especially in the case of significant material changes to its existing arrangements, to allow the DFSAG sufficient time to consider the application. If additional time is reasonably required to properly assess the impact of a proposed change due to its nature, scale and complexity, the DFSAG may make an appropriate extension of time beyond 30 days. Such an extension would be made in consultation with the applicant.

      [Added] DFSA RM123/2013 (Made 13th June 2013) [VER22/07-13]
      [Amended] DFSA RM175/2016 (Made 10th February 2016). [VER26/04-16]